Author: Ian Craig | Date: 27/07/15 Issue 4 | Reference: R50059/574
uPVC Window Frames & Doors Preparation
- Ensure surface is clean
- Abrade thoroughly with Red Scotchbrite
- Degrease with solvent-based degreaser (Spirit Wipe) either by: Wiping on with one clean rag and wiping off with another, or: Applying by spray and using a clean rag to wipe off.
Topcoat: Selemix Direct 7-53X
Polyester Powdercoated Aluminium Window Frames & Doors Preparation
- Ensure surface is clean
- Abrade thoroughly with Red Scotchbrite
- Degrease with solvent-based degreaser (Spirit Wipe) either by: Wiping on with one clean rag and wiping off with another, or: Applying by spray and using a clean rag to wipe off.
Topcoat: Selemix Direct 7-53X
Polyester Powdercoated Panelling Preparation
- Ensure surface is clean
- Abrade thoroughly with P360 abrasive discs
- Degrease with solvent-based degreaser (Spirit Wipe) either by: Wiping on with one clean rag and wiping off with another, or: Applying by spray and using a clean rag to wipe off.
Topcoat: Selemix Direct 7-53X
Bare Aluminium / Galvanised Steel (including rub-throughs to metal) Preparation
- Ensure surface is free of contamination and corrosion – If not remove by abrading or blast-cleaning.
- Abrade thoroughly with P240 discs
- Degrease with solvent-based degreaser (Spirit Wipe) either by: Wiping on with one clean rag and wiping off with another, or: Applying by spray and using a clean rag to wipe off.
Primer: Delfleet F379 or F393 Etch Primer
Topcoat: Selemix Direct 7-53X
Coloured Anodised Aluminium Preparation
- Ensure surface is clean
- Abrade thoroughly with P360 (or coarser) abrasive discs
- Degrease with solvent-based degreaser (Spirit Wipe) either by: Wiping on with one clean rag and wiping off with another, or: Applying by spray and using a clean rag to wipe off.
Topcoat: Selemix Direct 7-53X
Application of Paint Systems All paint systems must be applied according to the respective Technical Data Sheets F379 / F393 Etch primers may require an induction period prior to application. Please refer to TDS. F379 / F393 Etch Primers must be applied to a dry film thickness of 15-25 microns 7-53X Selemix Direct must be applied to a minimum dry film thickness of 80 microns.
Painting should not be carried out at temperatures below 5°C, or if the temperature is likely to drop below 5°C during the drying time of the paint
Painting should not be carried out if the Relative Humidity is above 80%.
The dew point should be tested prior to painting. The substrate temperature should be at least 3°C above the dew point. This is to avoid condensation forming.
Record the temperature, Relative Humidity and Dew Point at the time of painting.