CX Environments

CX Environments are exterior offshore areas with high salinity, industrial areas with extreme humidity and tropical atmospheres. Internally, they are industrial areas with extreme humidity. In accordance with ISO 12944:2018 in accordance with Part 9. All offshore systems must continue to go through 4,200 hours of cycling testing, which equates to 25 weeks.

Scroll to the bottom of this page for a full list of suppliers and their specifications.


Download the manufacturer specifications for steel systems below:

Carboline | Hempel | International | Jotun | PPG | Selemix | Sherwin Williams | Sika | Teknos
Guide To Working In Confined Spaces

Shop By
Filter by
  1. Price £100.00 - £199.99 Remove This Item
Filter by

4 Items

Set Descending Direction
  1. Sherwin Williams Zinc Clad II EU Ethyl Zinc Silicate Primer
    Sherwin Williams Zinc Clad II EU Ethyl Zinc Silicate Primer

    A self curing solvent based zinc silicate coating for the protection of blast cleaned steel surfaces up to 400°C.

    From £227.36 £189.47
  2. Sherwin Williams Macropoxy 646 Epoxy Primer Finish
    Sherwin Williams Macropoxy 646 Epoxy Primer Finish

    A versatile high performance polyamide cured epoxy designed to fulfil the needs of both new construction and maintenance painting to steel, aluminium ...

    From £197.74 £164.78
  3. Sherwin Williams Acrolon 1850 Acrylic Epoxy Finish
    Sherwin Williams Acrolon 1850 Acrylic Epoxy Finish

    A two pack isocyanate free finish based on an acrylic epoxy binder system. NORSOK M501 Rev 6 System 1.

    From £173.16 £144.30
per page